MRP, production & planning

From sales order to work order, in one chain

MRP and production planning software, on the same database as inventory and quality control

In many factories, sales quotations live in one system, the BOM in Excel, inventory in another system and work orders on paper. Afrandeh connects these links: open sales quotations, the released BOM and real warehouse stock are calculated together to show what has to be made and what has to be bought, and the work order or purchase request is created right there.

One chainfrom quotation to goods receipt
Versioned BOMwith validity dates and ECN
90 daysdefault MRP horizon, adjustable
6 reportscapacity analysis on one page
Why one chain?

When every link is a separate system, shortages show up on production day

The production planner has to gather sales figures, product structure and stock from several places, and every time one of them changes the calculation starts again.

Disconnected links

  • Sales quotations in one system, the BOM in an Excel file
  • Warehouse stock in another system, unaware of suspect material
  • Work orders on paper, with material usage recorded later by hand
  • No clear answer on which shortage to make and which to buy

The Afrandeh chain

  • Demand comes straight from open sales quotations
  • The released BOM and real warehouse stock are in the same calculation
  • Work orders and purchase requests are created from the same screen
  • And material issues and goods receipts post to the same warehouse
The workflow at a glance

Five links, one database

  1. 1

    Product structure

    Multi-level BOM, part revisions and BOM versions with validity dates

  2. 2

    Material requirements

    MRP builds net requirements and planned make or buy orders from open sales quotations

  3. 3

    Execution

    Work orders with a frozen BOM, good/scrap/rework reporting and material issues

  4. 4

    Closing

    Goods receipt and material issue in the warehouse, with e-signature

  5. 5

    Resource planning

    Machines, workshops, shifts, staff and the work calendar

Part 1

Bill of materials and engineering change control

Product structure is the basis of every calculation. Afrandeh keeps it versioned, so today's change doesn't disturb a plan that was locked yesterday.

Multi-level BOM

Each product is made of several materials or semi-finished items, and each semi-finished item can have its own tree. Gross and net quantity, scrap percentage and production time are recorded for each component, and the stock of each component is shown next to the tree.

Part revisions and BOM versions

Take a snapshot of the current BOM and release it with a validity period. A released version is locked, so later edits do not affect it. Pick a date to see the tree exactly as it was on that date.

Engineering change notice (ECN)

Releasing a new version and retiring an old one happen in one ECN document. After the approval steps are signed (one or more steps, with an "all" or "any" quorum), the changes apply in a single transaction: all or nothing.

Part 2

Material requirements planning (MRP)

Afrandeh's MRP starts from open sales quotations within a time horizon (90 days by default), explodes the released BOM level by level and calculates the net requirement for every item.

Net requirement formula
Gross requirement−Warehouse stock−Quarantine (NCMR)−Open work orders−Incoming purchase requests=Net requirement

Make or buy

An item with a valid released BOM on the need date is proposed as "make"; everything else as "buy".

Order size and lead time

The order quantity is rounded up to the item's order multiple, and the start date is the need date minus the lead time.

BOM scrap

One option includes the BOM scrap percentage in the calculation.

Result tabs

Planned orders, demand, supply (open orders and purchase requests), material needs of open orders, and alerts.

Smart alerts

Late items (start date already passed), circular BOMs, missing released BOMs and missing lead times appear in the Alerts tab.

One-click documents

Each "make" row becomes a draft work order and the "buy" rows a purchase request; once created, the quantity counts as incoming and is not proposed again.

Part 3

Work orders

From the moment it is released, a work order freezes its materials from the released BOM version, so later BOM changes do not affect work in progress.

DraftReleasedIn productionClosedor cancelled

Production reporting

Record good output, scrap and rework with a reason. Open rework is later dispositioned as "good" or "scrap".

Partial material issue

Materials are issued from the warehouse in several rounds and by batch (oldest first), without closing the order.

Closing with warehouse documents

At the end, the material issue and the goods receipt (with a new batch) are created. If any document is rejected, none is saved.

Material cost

Total direct material cost and cost per unit are calculated, and the unit cost becomes the price on the goods receipt.

E-signature

The work order's warehouse documents are approved through a signature workflow.

Serial tracking

For serialized items, the serial of each unit produced and of each part consumed is recorded, and QR or Code 128 labels can be printed.

Part 4

Scheduling on machines, shifts and staff

Once it is clear what has to be made, scheduling decides on which machine, in which shift and with whom.

Order analysis

Quotations are analyzed into three supply groups (finished goods, semi-finished, raw materials), and production requests, purchase orders, temporary issues and reservations are created from there.

Shortage for production

For a given run size, the usage, stock and shortage of every component is calculated as a full tree or first level only, with Excel export.

Product scheduling

Assign machine, workshop or station, shift and staff to a product, with "check quantity", "suggest quantity" based on calendar and shift, and conflict control.

Batch production planning

For batch production (such as chemicals): production suggestions, product schedules and semi-finished processing.

Production operations

Processes, prerequisites, stations and the assignment of each process to a product, with time, shift and machine.

Production staff output

A daily output document: who, on which machine, how much good, scrap and rework, with downtime reasons and piece rates.

Part 5

Modern production planning (OPC) and capacity

OPC defines each product's routing down to the second and builds the factory work calendar; capacity analysis shows where machines and staff are idle or overloaded.

Processes and sub-processes

A nested process structure, stations and the staff of each station.

Product routing

For each product or item category: priority, time per unit, start and end offsets, and permitted machines and shifts. Times are recorded to the second.

Production calendar

Weekly shift templates with breaks and permitted overtime, weekly and public holidays, a full-year calendar in one click and a monthly report of productive hours.

Min, max and safety stock

For each item: any period, minimum and maximum production and safety-stock days; in the classic model, the reorder point and critical point per warehouse.

Production capacity analysis: six reports on one page

  1. 1Machine idle time
  2. 2Staff output
  3. 3Production peaks
  4. 4Production report monitoring
  5. 5Forecast machine load (%)
  6. 6Production progress (%)
Connected to the rest of Afrandeh

Production doesn't work apart from the rest of the organization

Inventory

Material issues and goods receipts post directly to the warehouse; batches, expiry and FEFO are supported.

Sales

MRP demand comes from sales quotations, and sales, production and inventory are traced along one document chain.

Quality control

Nonconforming material in quarantine is deducted from MRP stock.

Human resources

Station staff come from HR records, and the production calendar is also used in attendance.

BI

Multi-dimensional production and capacity reports in the BI dashboard.

FAQ

MRP and production in Afrandeh: frequently asked questions

Where does Afrandeh's MRP get its demand from?

From open sales quotations. Sales forecasts are not yet supported as a demand source.

What happens if I don't have a released BOM?

MRP proposes the item as "buy" and shows a "no released BOM" alert. Once a BOM version is released, the item is treated as "make".

Can I plan batch and chemical production?

Yes. The batch production planning screen is designed for batch production and semi-finished processing.

Are work-order materials consumed by batch?

Yes. Material issues are made by batch, oldest batch first.

Where does your production start?

Bring your orders, BOM and warehouse stock; in the demo we walk the same data from quotation to work order.

Request a demo