BOM in Excel or Software? The Columns of a Complete Bill of Materials and When to Move

Which columns a complete bill of materials needs, how far Excel goes for a BOM, signs it is time to move to software, and what versioned BOMs and ECNs add.

By Afrandeh team4 min read

Almost every factory builds its first BOM (bill of materials) in Excel. It makes sense at the start: it is quick, everyone knows it and the format is free. The trouble begins when the BOM is no longer just a list but the basis for purchasing, production, product cost and planning. This article shows which columns a good BOM needs, how far Excel goes and when to move to software.

What is a BOM?

A BOM is the list of all materials, parts and semi-finished items needed to make one unit of a product, with the quantity of each. When a semi-finished item is itself made of several components, the BOM becomes multi-level and takes the shape of a tree:

  • Level 0: the finished product (for example, an office desk)
  • Level 1: semi-finished items (metal frame, MDF top)
  • Level 2: raw materials (steel sheet, bolts and nuts, MDF, PVC edge band)

The columns of a complete BOM

If you keep your BOM in Excel, have at least these columns:

Column Why it matters
Parent item code and name Shows which product or semi-finished item the row belongs to.
Component code and name Must match the warehouse item code, not free text.
Level Needed to build the tree and explode it level by level.
Net quantity and unit The quantity that actually ends up in one unit of product.
Scrap % / gross quantity The quantity that has to be issued from the warehouse.
Production time For scheduling and capacity planning.
Version and validity date Shows from which date this BOM applies.

In practice most errors come from the last two columns: scrap is forgotten and there is no version at all.

How far does Excel go?

Excel is enough for one product with one level and few changes. As the business grows, these problems appear:

  • Versions get lost. "Final BOM 2 revised" sits in one person's folder while others use the old one.
  • Item codes don't match the warehouse. A component is entered under a name that does not exist in inventory, so the shortage calculation is wrong.
  • Multi-level is manual. Exploding the tree for a run of 500 with nested formulas is fragile.
  • Stock is not next to the BOM. To know the shortage, you have to reconcile the BOM file with a warehouse report.
  • Uncontrolled change. Anyone who edits the file silently changes the production plan in progress.

Signs it is time to move

  • You have more than one level of semi-finished items.
  • The BOM gets engineering changes every few months.
  • Production and purchase planning are based on the BOM.
  • You calculate material cost from the BOM.
  • More than one person edits the BOM.

What a BOM in software adds

  • A real tree: each semi-finished item has its own tree and matches the warehouse items.
  • Stock next to the tree: the stock of each component is visible right there.
  • Locked versions: a released BOM is locked with a validity period, and later edits do not affect it.
  • Controlled change: engineering changes are applied with a document and signatures.
  • Connected to MRP and work orders: the same BOM drives material requirements planning and material issues.

BOMs in Afrandeh

In Afrandeh, the BOM is multi-level; for each component the gross and net quantity, scrap percentage and production time are recorded, and the stock of each component is shown next to the tree. You release a snapshot of the current BOM with a validity period; a released version is locked, and picking a date shows the tree exactly as it was then. Releasing a new version and retiring an old one happen in one engineering change notice (ECN) with signed approval steps, and the changes apply all at once.

With the shortage-for-production calculation you can also see, for a given run size, each component's usage, stock and shortage as a full tree or first level only, and export it to Excel. So Excel does not disappear; it just stops being the master data. In multi-company groups, the BOM can also be copied from an existing company to a new one with the code transfer tool.

To see your current BOM moved into Afrandeh, request a demo.

Tags:ProductionERP

Frequently asked questions

What is a BOM?

A BOM (bill of materials) lists all the materials, parts and semi-finished items needed to make one unit of a product, with the quantity of each.

Which columns should a BOM in Excel have?

Parent item code and name, component code and name, level, net quantity and unit, scrap percentage or gross quantity, production time, and version and validity date.

When should a BOM move from Excel to software?

When you have more than one level of semi-finished items, the BOM changes often, production and purchase planning or product cost depend on it, or more than one person edits it.