← Back to news
New Page: MRP, Production and Planning in Afrandeh
A new MRP, production and planning page is now on the Afrandeh website. It shows how Afrandeh keeps the factory's path, from sales quotation to work order and goods receipt, in one chain, on the same database that inventory and quality control use.
What's on the page
- Versioned bill of materials (BOM): a multi-level BOM with scrap and production time, locked released versions with validity dates, and engineering change notices (ECN) with signed approval steps.
- Material requirements planning (MRP): demand from open sales quotations, a net-requirement formula that deducts quality-control quarantine, and one-click work orders or purchase requests.
- Work orders: good, scrap and rework reporting, batch-level material issues, goods receipt with material cost, and serial tracking.
- Scheduling on machines, shifts and staff, plus batch planning for chemical production.
- Modern production planning (OPC): product routing, a production calendar and six capacity reports.
The page is linked from the Products menu, under "Production & Operations", and from the Production section of the products page. The article What Is MRP? has been published on the blog at the same time.